Shower Remodel in Charleston, SC
Wisebuild does shower remodels in Charleston, SC: tiled walk-in showers and tub-to-shower conversions, built on a properly prepped, waterproofed base. One crew takes the job from demolition to the last piece of trim, including the plumbing and electrical that go with it, and you get a written estimate before anything starts.
Below, photos from our own jobs follow a shower from bare studs to finished tile.
Call or text (854) 295-0092 for a free shower estimate

Three ways a shower remodel usually starts
- Tub to shower. The tub comes out, the base is rebuilt and waterproofed, and the new shower is tiled from the pan up. It is one of the jobs we are asked for most.
- Old shower, new shower. A leaking or dated shower is taken back to the studs and rebuilt, often larger, with a niche or a bench.
- Shower inside a full bathroom remodel. The shower is the biggest piece of a larger job, covered on our bathroom remodeling in Charleston page.
At the consultation we tell you what the existing plumbing and framing allow, which decides how far the drain and the valve can move.
From bare studs to glass: four stages from our jobs
1. Back to the framing
Old tile, board and pan come out until the framing, the drain and the supply lines are visible. This is when hidden water damage shows up and gets fixed, before anything new covers it.

2. Waterproofing before any tile
On the shower below, the walls and base are covered with a waterproof foam board system, every seam and corner banded. Other jobs of ours use a liquid-applied membrane. Either way, tile and grout go on top, and the waterproof layer is what keeps water out of the walls.

3. Tile, niche and curb
Wall tile is set level and cut clean around the niche and the valve, and the curb is capped. Grout follows once the setting material has cured.

4. Glass, trim and the final walkthrough
Glass, valve trim and fixtures go in last. We walk the finished shower with you, and it is not done until you are happy with it.
Call or text (854) 295-0092 to set up the consultation, or send us photos of your current shower.
Rules a new shower has to meet in South Carolina
South Carolina builds to the 2021 International Residential Code with state changes. These are the shower rules that shape a remodel, by section:
| Rule | Section | What it means for your shower |
|---|---|---|
| At least 900 square inches of floor and 30 inches in the smallest dimension; 22-inch clear opening | P2708.1, P2708.1.1 | A 30 x 30 in. shower is the minimum; a standard 60 x 30 in. tub alcove has twice that area |
| Pressure-balanced or thermostatic valve, with a limit set at 120°F | P2708.4 | If the existing valve does not meet this, it is replaced during the remodel |
| Curb threshold at least 1 in. below the sides and back; curb 2 to 9 in. deep to the drain; floor sloped 1/4 to 1/2 in. per foot | P2709.1 | The slope is built into the base, not fixed with tile |
| On-site shower floors lined with an approved liner or a bonded membrane meeting ANSI A118.10, at least 2 in. above the threshold | P2709.2 | The waterproof layer has to turn up past the curb, not stop at it |
| A non-absorbent surface at least 6 feet above the floor | R307.2 | Tile or another waterproof finish to 6 feet, often to the ceiling |
| Safety glazing in shower enclosures | R308.4.5 | Glass doors and panels must be labeled safety glass |
Inside the City of Charleston, a shower that changes plumbing needs a plumbing sub-permit, and a shower pan test is on the City's inspection list. Our article on the bathroom remodel permit in Charleston SC walks through which permits apply and when inspections happen.
Tile, panel systems or keeping the tub
| Option | Good fit when | Trade-offs |
|---|---|---|
| Tiled shower over a waterproof membrane | You want a custom size, a niche or bench, a specific tile, or a curb-height choice | More steps and cure time; the waterproofing has to be right because it is hidden |
| Acrylic or composite wall panels | Speed matters more than design choice | Limited sizes, colors and details; not what our published showers use |
| Keep the tub, redo the surround | The home needs a tub, or the room is small | The step-over stays |
Choosing the wall tile is a decision of its own. If an old shower has cracked tile, the cause is usually behind it; why shower tiles crack explains what to look for.

What changes the price of a shower remodel
We do not publish a range, because a number quoted before seeing the bathroom is a guess. The estimate is free, in writing, with the line items spelled out. What moves it:
- Removing a tub, or rebuilding an existing shower
- Moving the drain or the valve, and replacing an old valve
- Shower size, niches, benches and curb height
- Tile size, pattern and material, wall height of the tile
- The waterproofing system and any framing or subfloor repair found at demolition
- Glass: door, fixed panel or none
- Permits and inspections when plumbing changes
One crew, one point of contact
Wisebuild is led by its founder, Leonardo Oliveira. Tile is one of our two specialties, next to hardwood, and our crew takes on the finishing trades that come with a shower: trim, drywall, paint, plumbing and electrical. So the plumber, the electrician and the tile setter are not three separate companies on your calendar.
Shower tile on its own, or tile in other rooms, is on our tile installation in Charleston page.
When we are not the right fit
- A one-day acrylic liner over the old tub. Our published showers are tiled; bath-system companies are set up for liners.
- Adding a new bathroom to the house. We do not build additions. If the structure is handled by someone else, we can take on the bathroom inside it.
Shower remodel questions
Do you need a permit to change a tub to a shower in Charleston?
In the City of Charleston, yes when the plumbing changes: the City's guidance calls for a plumbing sub-permit when plumbing is in scope, and the inspection list includes a shower pan test. Outside city limits, check with that town or county.
Can I turn my bathtub into a walk-in shower?
Usually, yes. A standard tub alcove gives more than the code minimum of 900 square inches. What the existing drain, valve location and framing allow is what we check at the consultation.
What are the disadvantages of a walk-in shower?
Without a door, water can reach the bathroom floor, so the glass layout and the slope matter. Glass needs regular cleaning. And if it replaces the only tub in the house, families with small children may miss it.
How long does a shower remodel take?
It depends on scope: a re-tile in the same layout moves faster than moving the drain, and tile and grout need cure time between stages. Inspections, when plumbing changes, also set the pace. You get a realistic schedule with the estimate.
Is it a good idea to remove the bathtub?
It depends on the house. If there is another tub, the trade-off is small. If it is the only one, think about who bathes in it now and who may later, including buyers if you plan to sell.
Shower remodels across Charleston
Charleston · Mount Pleasant · Isle of Palms · Sullivan's Island · West Ashley · Daniel Island. Nearby but not on the list? Call; we may still be close enough.
Monday to Friday, 8 AM to 5 PM; Saturday visits by appointment.
Call (854) 295-0092 · Text (854) 295-0092 · [email protected]
• Request an estimate
